1. UDOT
  2. UDOT Events

Project: SR-18; St. George Blvd. to Main St

Apr28

The Utah Department of Transportation (UDOT), in collaboration with St. George City, is conducting a State Environmental Study (SES) to evaluate the potential environmental impacts of proposed improvements on SR-18 (Bluff Street) in St. George, Utah.

UDOT proposes to utilize state funding for roadway enhancements along SR-18 from Convention Center Dr. (MP 0.00) to St. George Blvd. (MP 2.01). The project aims to increase corridor capacity by widening SR-18, adding a southbound travel lane, turn lanes at select intersections, and consistent shoulders. Additional improvements include pavement rehabilitation, a multi-use trail, drainage enhancements, utility relocations or adjustments, and traffic signal upgrades.

To enhance safety, the project will introduce a raised median between Main St. and 100 South, incorporating landscaping where appropriate. Right-of-way acquisition or easements will be necessary at various locations to facilitate these improvements.

UDOT encourages area residents and businesses to attend a public hearing regarding the above-proposed Bluff Street enhancements. The hearing will be held in an open house-type format on Thursday, April 24 from 5 to 7:00 p.m. at Dixie Middle School, 929 S 100 E, St. George, UT 84770. The open house will include informational display boards, project information handouts, provisions to accommodate oral and written comments, and project team members to answer questions.

The meeting room meets accessibility requirements outlined by the Americans with Disabilities Act (ADA). If you have any language, audio, visual, or other ADA needs, please contact Lisa Beck by phone at 435-531-1358 at least 48 hours prior to the meeting. If you are unable to attend in person and wish to comment or obtain additional information, you may submit comments or inquiries via phone (435-531-1358); email (lisa@harmonypublicinvolvement.com); or mail (Harmony Public Involvement Attn: SR-18; St. George Blvd to Main St., 1453 S Dixie Drive, Ste 150, St. George UT 84770). The comment period begins on April 6. Comments must be received or postmarked by May 6, 2025.

Dixie Middle School
929 S 100 E, St. George, UT

April 28, 2025 : 05:00 pm - 07:00 pm

Share "Project: SR-18; St. George Blvd. to Main St" to your social network: