Alternative Delivery
Alternative Delivery
UDOT utilizes Alternative Delivery methods such as Design-Build (DB), Progressive Design-Build (PBD) & Construction Manager / General Contractor (CMGC) on projects as a way to provide value by reducing time/costs and improving quality.
Alternative Delivery Manuals and Forms
Design-Build (DB) Information
Design-Build Laws, Rules, Policies & Guidelines:
Federal Authority/Legal-
Title 23 U.S.C 112(b)(3)
Title 23 C.F.R Part 636
Utah Authority/Legal-
Utah Code – 63G-6a-1402
Utah Admin Rule – R916-3
UDOT Policy/Guidelines-
UDOT Policy 08A-11: Design-Build Projects
UDOT Policy 08A-12: Advertising and Awarding Design/Build Contracts
Design Build Selection Manual of Instruction
Design-Build Documents-
Design-Build Advertising Checklist
Design-Build Advertising Checklist Instructions
RFP-
Best Value ITP Appendix A
Best Value ITP Appendix B
Best Value ITP Best Value ITP Appendix C Cover
ITP App C Form A Clarification Request Form
ITP App C Form B Alternative Technical Concept Response
ITP App C Form C Alternative Technical Concept Response
ITP App C Form D Proposal Letter
ITP App C Form E Business Confidentiality
ITP App C Form F Single Point of Contact
ITP App C Form G Statement of Representations
ITP App C Form H Substantial Completion Date
ITP App C Form I Roadway Closures
ITP App C Form J Escrow Proposal Cover Sheet
ITP App C Form K Escrow Agreement
ITP App C Form L Compensable Project Overhead
ITP App C Form M Price Allocation
ITP App C Form N Third-Party Costs
ITP App C Form O Stipend Agreement
ITP App C Form P Instruction to Obtain Project Portal User Access – SAMPLE
Information Only Material
Part 1 Agreement
Part 1 Appendix A – Acronyms and Definitions
1-Part 2 – General Provisions
Appendix A – 1 Federal Requirements
Appendix A – Attachment 1 – Use of DBE
Appendix A – Attachment 2 – FHWA Form 1273
Appendix A – Attachment 3 – Federal Prevailing Wage Rates
Appendix A – Attachment 4 – Form C-130 Training Commitment Form
Appendix B – NON-OCIP_Insurance
Appendix B – OCIP_Insurance
Appendix C – Dispute Resolution Form
Appendix D – Request for Payment of Materials (Form 01282A)
Appendix E – Certificate of Title to Stored Materials (Form 01282B)
Appendix F – Request for Progress Payment (Form 01282C)
Appendix G – Performance Bond.doc
Appendix H – Payment Bond.doc
Appendix I – Completion Disincentives and Liquidated Damages
Appendix J – Cost Analysis for Request for Change Order
Appendix K – Equal or Better Change Proposal Form
Appendix L – Facilities and Space Requirements
Part 3 – Quality-Construction IQF
Part 3 – Quality-UDOT-Lead
Template QMP
AFC form
ERFC Form
RFC Form
4-00 – Project Design and Construction Requirements TOC
4-01 – Project Configuration
4-02 – General Design and Construction Requirements
4-03 – ITS
4-04 – Drainage
4-05 – Environmental Compliance
4-06 – Geotechnical
4-07 – Aesthetics
4-08 – Lighting
4-09 – Maintenance During Construction
4-10 – Maintenance of Traffic
4-11 – Pavement
4-12 – Public Information and Information Services
4-13 – Railroad
4-14 – Right-of-Way
4-15 – Roadways
4-16 – Signs
4-17 – Structures
4-18 – Traffic Signals
4-20 – Visual Documentation
Part 5 – Cover & Special Provisions (1)
Part 5 – Exceptions (1)
1-Part 6 – Third-Party Agreements Title Page
DB Municipals DB Performed Master Template
DB Utility 50_ Reimb Agmt Self Performed Work Master Template
DB Utility 50_ Reimb Agmt w DB Contractor & Company Performed Work Master Template
Exhibit A Supplemental Agreement Form
New Exhibit A Supplemental Agreement Form
New Master Agreement (Project Third-Party Utilities)
Part 7 – Contract Drawings (1)
Part 8 – Engineering Data
Part 9 – Warranty Provisions
Construction Manager / General Contractor (CMGC) Information
CMGC Laws, Rules, Policies & Guidelines:
Federal Authority/Legal-
MAP-21 Section 1303
Utah Authority/Legal-
Utah Code – 63G-6a-1303
Utah Admin Rule – R916-4
UDOT Policy/Guidelines-
CMGC Contractor Selection MOI
CMGC Documents-
CMGC CMGC Award Checklist
CMGC CMGC Award Checklist Instructions
Progressive Design Build (PBD) Information
To provide additional information about the Progressive Design Build process the U.S. 89 project team created a separate website. PDB Documents-
Progressive Design-Build Award Checklist
Progressive Design-Build Award Checklist Instructions
Alternative Delivery Past Proposal Requests
Proposers for upcoming DB, PBD & CMGC projects can view past proposals for awarded contracts by contacting Alternative Delivery. Please complete the Alternative Delivery Past Proposal Request Form and identify the proposal you would like to schedule for an in person review.