Alternative Delivery
Alternative Delivery

UDOT utilizes Alternative Delivery methods such as Design-Build (DB), Progressive Design-Build (PBD) & Construction Manager / General Contractor (CMGC) on projects as a way to provide value by reducing time/costs and improving quality.
Alternative Delivery Manuals and Forms
Design-Build (DB) Information
Design-Build Laws, Rules, Policies & Guidelines:
Federal Authority/Legal-
Title 23 U.S.C 112(b)(3)
Title 23 C.F.R Part 636
Utah Authority/Legal-
Utah Code – 63G-6a-1402
Utah Admin Rule – R916-3
UDOT Policy/Guidelines-
UDOT Policy 08A-11: Design-Build Projects
UDOT Policy 08A-12: Advertising and Awarding Design/Build Contracts
Design Build Selection Manual of Instruction
Design-Build Documents-
Design-Build Advertising Checklist
Design-Build Advertising Checklist Instructions
RFP-
Best Value ITP Appendix A
Best Value ITP Appendix B
Best Value ITP Best Value ITP Appendix C Cover
ITP App C Form A Clarification Request Form
ITP App C Form B Alternative Technical Concept Response
ITP App C Form C Alternative Technical Concept Response
ITP App C Form D Proposal Letter
ITP App C Form E Business Confidentiality
ITP App C Form F Single Point of Contact
ITP App C Form G Statement of Representations
ITP App C Form H Substantial Completion Date
ITP App C Form I Roadway Closures
ITP App C Form J Escrow Proposal Cover Sheet
ITP App C Form K Escrow Agreement
ITP App C Form L Compensable Project Overhead
ITP App C Form M Price Allocation
ITP App C Form N Third-Party Costs
ITP App C Form O Stipend Agreement
ITP App C Form P Instruction to Obtain Project Portal User Access – SAMPLE
Request for Proposal (RFP) – Information Only Material
RFP Part 1 – Agreement
RFP Part 1 Appendix A – Acronyms and Definitions
RFP Part 2 – General Provisions, February 2025
RFP Appendix A – 1 Federal Requirements
RFP Appendix A – Attachment 1 – Use of DBE
RFP Appendix A – Attachment 2 – FHWA Form 1273
RFP Appendix A – Attachment 3 – Federal Prevailing Wage Rates
RFP Appendix A – Attachment 4 – Form C-130 Training Commitment Form
RFP Appendix B – NON-OCIP_Insurance
RFP Appendix B – OCIP_Insurance
RFP Appendix C – Dispute Resolution Form
RFP Appendix D – Request for Payment of Materials (Form 01282A)
RFP Appendix E – Certificate of Title to Stored Materials (Form 01282B)
RFP Appendix F – Request for Progress Payment (Form 01282C)
RFP Appendix G – Performance Bond.doc
RFP Appendix H – Payment Bond.doc
RFP Appendix I – Completion Disincentives and Liquidated Damages
RFP Appendix J – Cost Analysis for Request for Change Order
RFP Appendix K – Equal or Better Change Proposal Form
RFP Appendix L – Facilities and Space Requirements
RFP Part 3 – Quality-Construction IQF
RFP Part 3 – Quality-UDOT-Lead
Quality Management Plan (QMP) Template
AFC form
ERFC Form
RFC Form
FRP 4-00 – Project Design and Construction Requirements TOC
4-01 – Project Configuration
4-02 – General Design and Construction Requirements
4-03 – ITS
4-04 – Drainage
4-05 – Environmental Compliance
4-06 – Geotechnical
4-07 – Aesthetics
4-08 – Lighting
4-09 – Maintenance During Construction
4-10 – Maintenance of Traffic
4-11 – Pavement
4-12 – Public Information and Information Services
4-13 – Railroad
4-14 – Right-of-Way
4-15 – Roadways
4-16 – Signs
4-17 – Structures
4-18 – Traffic Signals
4-20 – Visual Documentation
RFP Part 5 – Cover & Special Provisions (1)
Part 5 – Exceptions (1)
RFP Part 6 – Third-Party Agreements Title Page
DB Municipals DB Performed Master Template
DB Utility 50_ Reimb Agmt Self Performed Work Master Template
DB Utility 50_ Reimb Agmt w DB Contractor & Company Performed Work Master Template
Exhibit A Supplemental Agreement Form
New Exhibit A Supplemental Agreement Form
New Master Agreement (Project Third-Party Utilities)
RFP Part 7 – Contract Drawings (1)
RFP Part 8 – Engineering Data
RFP Part 9 – Warranty Provisions
Construction Manager / General Contractor (CMGC) Information
CMGC Laws, Rules, Policies & Guidelines:
Federal Authority/Legal-
MAP-21 Section 1303
Utah Authority/Legal-
Utah Code – 63G-6a-1303
Utah Admin Rule – R916-4
UDOT Policy/Guidelines-
CMGC Contractor Selection MOI
CMGC Documents-
CMGC CMGC Award Checklist
CMGC CMGC Award Checklist Instructions
Progressive Design Build (PBD) Information
To provide additional information about the Progressive Design Build process the U.S. 89 project team created a separate website. PDB Documents-
Progressive Design-Build Award Checklist
Progressive Design-Build Award Checklist Instructions
Alternative Delivery Past Proposal Requests
Proposers for upcoming DB, PBD & CMGC projects can view, in person, past proposals for awarded contracts by contacting Alternative Delivery at alternativedelivery@utah.gov to set up a date and time. Please provide details in regards to the project proposal you are interested in viewing.